Construction project

The EFSR has secured a 30-year lease on a hectare of land in Salakamreuk.

It will be built in several phases. Phase 1 should be finished for the start of the school year in September 2024. This model video, produced by Asma Architecs, shows the entire project. It will be located just 1.8 km from the current location.